Airfield layout
Both runways, taxiways, aprons and major structures, with custom markings, signs and ground surfaces.
KBFM · Mobile, Alabama Map
Microsoft Flight Simulator 2020 & 2024
Explore Mobile Bay’s waterfront airport, the Airbus assembly campus and Brookley’s cargo and maintenance facilities.
Both runways, taxiways, aprons and major structures, with custom markings, signs and ground surfaces.
A detailed recreation of the new passenger terminal, including a fully modelled interior.
The assembly campus, maintenance and cargo facilities, with all hangars and selected interiors.
PBR materials, high-resolution textures, dynamic lighting and custom sounds, with simulator performance in mind.
Airport-specific vehicles, animated people, moving jetways, trains and ground traffic.
Selected buildings, bridges and landmarks around the harbour and in downtown Mobile.
Compatible with Microsoft Flight Simulator 2020 and 2024, and with Drzewiecki Design, Orbx and Asobo products.
The retailer installer adds the scenery to your simulator library. Re-run it to change the optional features.
Mobile International Airport (KBFM) is part of the Mobile Aeroplex at Brookley, three nautical miles south of downtown Mobile. Its two runways lie beside Mobile Bay, close to both the port and the city. Cargo aircraft, business aviation and newly assembled airliners share an airfield whose waterfront location has shaped its working life for nearly a century.
Brookley began as Bates Field, Mobile’s municipal airport, in 1929. The US Army Air Corps acquired the site in 1938 and developed it into a major wartime aircraft overhaul and supply centre. After the base closed in 1969, the city put the runways and hangars back to civilian use. In 1984, NASA’s Boeing 747 brought Space Shuttle Enterprise here so it could continue by barge to the World’s Fair in New Orleans.
Airbus began assembling A320-family aircraft at Mobile in 2015, followed by A220 production. The assembly halls and delivery aprons now form part of the same waterfront complex as the cargo and maintenance facilities. The scenery also depicts the five-gate passenger terminal described in the Mobile Airport Authority project update.